The spar and front rib sections are connected, and the leading edge can now be glued on. The block under the clamp connects the leading edge to the top rib. I’m not sure why it has to be so massive, but if it’s in the drawing, then that’s how it’s built.
top of page
PROGRESS
bottom of page