The elevon trim pulleys and cable guards in the nose gear bay are all installed.
The bases are alle very massiv. It would be sensible to size them down but there’s a dilemma: Every alteration must be documented which would result in pages of calculations. I chose to stick to the original blueprints in this case.
In case you are wondering where the cables will lead through: