Blog via E-Mail abonnieren

Gib deine E-Mail-Adresse an, um diesen Blog zu abonnieren und Benachrichtigungen über neue Beiträge via E-Mail zu erhalten.

Rudder pulley

Metal work, finally! The pulley and its attachment feet comes in one piece. It is bolted to the bottom of the rudder.It took me a

Read More »

Rudder

Two month of intense woodwork show results. The rear rib sections are completed and installed, including vertical stringers and the cutout for the rudder tab.

Read More »

Vertical ribs and stringers

Looks like an aircraft already!The fitting of the vertical ribs in the nose section took some effort. Very much like the precise cutting out of

Read More »

Leading edge spar

Main spar and front ribs are all installed. Time for fitting the leading edge spar. Note the clamped woodblock at the top. The reason why

Read More »

Cutouts!

My woodwork skills are on a steep learning curve. It took me 5 (five!) attempts to mill these cutouts until I managed not to break

Read More »

Basic fin structure

The bottom rib is completed and the spar is closed up with plywood. The shape of the leading edge is not linear and therefore needed

Read More »

Rib flange

Contrary to the bottom rib flanges which are made of poplar wood, the other rib flanges are made of laminated spruce.  It requires a jig

Read More »